Plastic Recycling Facility

Project Details:

  • Location

    Royton, Oldham

  • Sector:
  • Project Value:

    c. £75k

Project Review

  • The Challenge

    Our Client was expanding their recycling facility requiring groundworks for a new 70mx14m steel framed building.

  • Our Approach

    Despite environmental and planning difficulties delaying the construction phase, and ultimately shortening the programme, we consulted effectively with the Client and worked diligently once on-site to still deliver our packages within their deadline, whilst their facility remained fully operational.

    We again worked collaboratively, successfully mitigated the need for exhaustive break-out and cart-away of the existing hardstanding, which the Client had expected and budgeted to be the case.

  • Project Delivery

    Our works consisted of

    • Pre-construction budgeting, value engineering and consulting on design/scope adaptions during a changing environment
    • Assisting the client with structural details and solutions to various planning/environmental challenges being faced
    • Undertaking of ground bearing tests to establish foundation design
    • Sawcut and breakout of localised hardstanding and installation of 30 nr. RC pad foundations
    • Installation of dished channel kerbs diverting plastic waste/surface water back into existing water treatment plant
    • Installation of new 1500dia PCC sump manhole
    • Adaption of various existing drainage systems and raising of ironworks to existing SW manhole to be formed into new concrete slab
    • Sub-base, regulating and preparation for new concrete slabs